PVC pipes and connections installations are in different ways :
- Glue connection pipe
PVC glue can be hold in 4 to 47 degrees of centigrade . be careful, this glue should not be tightened.
- Cut the tube perpendicular to the cutting axis and make the pipe clearly smooth
- Mark the outer surface of the pipe
- Clean up the pipe from any oil or moisture. Pollution reduces Adhesion
- Cover the pipe outer and inner surface with glue
- Before the adhesive is dried, press the pipe to the pixel and wait for 15 to 30 seconds.
- After the installation is completed clean the extra glue.
- The enough time to tighten the pipe and connection together is 10 to 15 minutes.
- Sealing test for three meter height can be done after 24 hours.
Leave A Comment