Sewage splitter installation on the pipe process steps are listed below :

  • Use pipe abrasive to make holes on pipe
  • Put splitter inside the hole to make the adaptive piece stand perpendicularly on axis
  • Stabilization unit fixing between pipe hole wall and splitter to be in touch with splitter body part
  • Put intermediate piece inside the splitter main body as directed
  • Tighten beads first by hand and then by using wrench