PVC Pipe Installation

PVC Pipe Installation

PVC pipes and connections installations are in different ways :

  • Glue connection pipe

PVC glue can be hold in 4 to 47 degrees of centigrade . be careful, this glue should not be tightened.

  • Cut the tube perpendicular to the cutting axis and make the pipe clearly smooth
  • Mark the outer surface of the pipe
  • Clean up the pipe from any oil or moisture. Pollution reduces Adhesion
  • Cover the pipe outer and inner surface with glue
  • Before the adhesive is dried, press the pipe to the pixel and wait for 15 to 30 seconds.
  • After the installation is completed clean the extra glue.
  • The enough time to tighten the pipe and connection together is 10 to 15 minutes.
  • Sealing test for three meter height can be done after 24 hours.
Tags:
Iran-U.S. negotiation over dollars
Iran-U.S. negotiation over dollars

U.S. President and Department of Treasury are looking for the ways to reopen the trading...

Three thousand million dollars injecting into the market
Three thousand million dollars injecting into the market

Iran’s Deputy Minister of Roads and Urban Development  said “Facility is the most important type...

Housing and dollar market
Housing and dollar market

Sadegh Alhosseini, a senior investment analyzer said “The housing market of Iran will not change in...

Bank interest rate
Bank interest rate

According to the Eghtesad Online, ValiOllah Seif the head of the central bank of Iran...